|
Still deciding? Get samples of $ !
Request Sample
|
| Customization: | Available |
|---|---|
| After-sales Service: | Online Support |
| Application: | Cable Well, Discharge Flue, Elevator Room, Stairway |
Suppliers with verified business licenses





|
Door Rating
|
Wall Rating
|
Description and Use
|
|
3 Hour (180 Minutes)
|
4 Hour
|
These openings are in wall that separate buildings or divide a single building into designated fire areas.
|
|
1-1/2 Hour (90 Minutes)
|
2 Hour
|
Openings of this type are used in enclosures of vertical communication or egress through buildings. Examples include stairwells
and elevator shafts. They also occur in boiler rooms and in exterior walls that have the potential for severe fire exposure from the outside of the building. |
|
1 Hour (60 Minutes)
|
1 Hour
|
These door and frame assemblies divide occupancies in a building.
|
|
3/4 Hour (45 Minutes)
|
1 Hour
|
For use where there are openings in corridors or room partitions. A door with this rating may also be located in the exterior wall
of a building subject to moderate fire exposure from the outside of the building. |
|
1/3 Hour (20 Minutes)
|
1 Hour
|
These openings are in corridors where smoke and draft control is required.
|
|
Size
|
Multiple sizes available, customization supported
|
|||
|
Certificates
|
SGS, ISO 9001:2000, CE, KYNAR 500, etc.
|
|||
|
Service
|
Manufacture products according to customers' drawings
|
|||
|
Delivery Time
|
Approximately 20 days, subject to panel drawings and order quantity
|
|||
|
Additional Services
|
Support OEM and ODM services, free samples provided
|
|||
|
Packaging
|
custom
|
|||