Fire doors are vital products for use in places such as residences, shopping malls, hospitals, workplaces, cinemas, theaters and concert halls, hotels, factories, warehouses. The wide product range of fire doors is suitable to meet the needs in these areas. Fire exit door and sheet metal frames have corner frame (half frame), adjustable frame and fixed frame options suitable for all wall thicknesses as standard. If an adjustable frame (Full frame) is requested, it is produced in a way that can grip the frame wall with the changes made in the section of the frame profile and the extra closing profiles to be provided. Opening direction and wall thickness information are important for full case orders.
| Fire Door Specification |
| Filler Material |
Perlite, honeycomb paper, aluminum silicate cotton ect. |
| Fire rated time |
20 mins up to 180mins. |
| Size |
Up to 9' - 5.7"*10'-2.2" ft(height) /2888*3104mm(height) (Can also be customized according to technical requirements) |
| Door leaf sheet |
22 Ga.-18 Ga.(0.8/1.0/1.2mm) galvanized steel/customized |
| Door frame sheet |
16 Ga.-14 Ga.(1.5mm-2.0mm) galvanized steel/customized |
| Door thickness |
45mm/50mm/customized |
| Fireproof glass |
400*700*35mm/500*700*35mm/customized |
| Color |
RAL color system, could be customized as well. |
| Accessories(extra cost) |
Lock, handle, hinges, door closer, panic bar and other as requested. |
| Package |
Inside:PE paper , Outside: double layers carton box and wooden pallets. |







Q: What are your main products?
A: As a leading manufacturer of special doors in China, our product range includes fire doors, hospital doors, ward doors, industrial cleanroom doors, soundproof doors, explosion-proof doors, etc.
Q: What certifications do you have?
A: We have obtained certificates such as UL, CE, NFPA, BS, ISO9001 through professional testing by relevant agencies.
Q: How can I know your prices?
A: Tell us your specifications and quantity requirements, and we will send you a quote.
Q: How do you ensure the quality of your products?
A: We not only provide trustworthy product certificates but also implement a quality control process through initial inspection, re-inspection, final inspection, and sampling inspection to ensure quality.
Q: What are your payment terms?
A: Generally, a 50%-70% deposit of the total amount should be paid via wire transfer before delivery, and the balance upon delivery. An irrevocable letter of credit is also acceptable.
Q: What is your delivery time?
A: Approximately 20 working days after the deposit and drawings are confirmed.